Probably 10 hours in design, 100+ hours cutting/fabrication.
1/4" mild steel
started with files from this thread
https://plasmaspider.com/viewtopic.php? ... ll#p165407
PolyCam capture
https://poly.cam/capture/1B8963D8-9558- ... ADD3A7B6A7
soccerball of death firepit
-
- 1.5 Star Elite Contributing Member
- Posts: 37
- Joined: Wed May 27, 2020 11:06 pm
- Location: Austin, TX
- tnbndr
- 4.5 Star Elite Contributing Member
- Posts: 1671
- Joined: Mon Jan 09, 2012 4:30 pm
- Location: New Berlin, WI
- Contact:
Re: soccerball of death firepit
Nice job. Wouldn't want to carry that around very far!!!!
Dennis
LDR 4x8, Scribe, DTHCIV
Hypertherm PM45, Macair Dryer
DeVilbiss Air America 6.5HP, 80Gal., 175psi, Two Stage
16.9scfm@100psi, 16.0scfm@175psi
Miller 215 MultiMatic
RW 390E Slip Roll (Powered)
AutoCAD, SheetCAM, Mach 3
http://ikescreations.com
LDR 4x8, Scribe, DTHCIV
Hypertherm PM45, Macair Dryer
DeVilbiss Air America 6.5HP, 80Gal., 175psi, Two Stage
16.9scfm@100psi, 16.0scfm@175psi
Miller 215 MultiMatic
RW 390E Slip Roll (Powered)
AutoCAD, SheetCAM, Mach 3
http://ikescreations.com
-
- 3 Star Member
- Posts: 359
- Joined: Fri Apr 15, 2011 3:47 am
Re: soccerball of death firepit
Wow! Very nicely done, looks phenomenal